Possibly. You'd have to do something like a cg in track drilling on the X, and really polish it up. The Deuce you could do a pin over bridge, cg out drill, leave it in box, then stack the Triple and sand it like you said. Might be better to make the Deuce the oiler instead of the Triple, Monsoon's kinda arc-ish and early to begin with.
--------------------
The weekly signature series, by Hamster, presenting a mini-series of quotes from Shrek!
"Oh I'll find those stairs, I whip they butt too. They won't know which way they going. Give me a step right here and now, I'll step all over it, kick it to the curb. I am the stair masta, I've masta'd the stairs."